 |
 |
 |
Zhijiang dam cut |
Qing river dredging |
Qing river dredging |
 |
 |
 |
Soil formation |
Soil formation |
Soil formation |
 |
 |
 |
| Completion of soil formation |
Stone vessels transporting |
The delivery of stone |
 |
 |
 |
Filter material grade separationStone |
Expected to ship transportingsand |
Slope formation |
 |
 |
 |
Small cushion stone slope |
Soil stone sand cushion |
Gravel formation |
 |
 |
 |
Gabion assembly |
Gabion assembly |
Scree test equipment |
 |
 |
 |
Renault pad assembly |
Renault pad assembly |
Good assembly gabion |
 |
 |
 |
Good assembly gabion |
Under construction |
Renault installed geotextile pad |
 |
 |
 |
Stone materials into |
Stone pipe material |
Construction has finished at the scene |
 |
 |
 |
Cage delivered to site |
River sand |
Sand and gravel delivered to the site |